
Dubai Marina Tower: MEP Plant Installation
Tandem lift of 48-tonne rooftop MEP plant using two 250-tonne all-terrain cranes. Full engineered lift plan and OSHAD documentation provided.
Project Overview
Tandem lift of 48-tonne rooftop MEP plant using two 250-tonne all-terrain cranes. Full engineered lift plan and OSHAD documentation provided.
Have a Similar Lift Coming Up?
Share your load, location and dates. Our team responds to every enquiry within 2 hours.


